1-1

( 5 / D / 2014 )

– Tender No : ( 5 / D / 2014 ).

– Project Name : (Supply and installation over head line of double Circuit the length of 11.5 km + underground cable (1*400)mm2 \ 33 k.v length 1.5km double circuit to the Turkish Hospital in Maysan)

– Project Cost: (2,051,920,000)

– Year: (2014-2015)

End User : (Directorate-General of electricity distribution south)

(18/Electricity/Distribution)

– Tender No : (18/Electricity/Distribution) .

– Project Name: (Supplying and installation feeders 11 K.V from Aljarahy station to area near Hartha sharing with Alwaad Alsadeq company )

– Project Cost : (1,049,000,000)

– Year : (2011 – 2012)

End User: (Basra governorate / Directorate-General of electricity distribution south)

1-2
1-3

(26 / Electricity / Distribution)

– Tender No: (26 / Electricity / Distribution).

– Project Name : ( Project to improve and develop and the delivery of electricity to areas Ezzdine Salim sharing with Shanasheel General Contracting Co. Ltd.)

– Project Cost : (2,643,025,000)

– Year :(2011 – 2012)

End User : (Basra governorate / Directorate-General of electricity distribution south )

(2 \ 2015)

– Tender No: (2 \ 2015).

– Project Name: ( Installation overhead line 132 K.V double circuit)

– Project Cost: (3,300,000,000)

– Year: (2014 – 2015)

End User: (Basra governorate / General Directorate for electrical energy transmission / South)

1-4
1-5

(10 / Diwan )

– Tender No: (10 / Diwan )

– Project Name:(Supplying, installation,operation and test transfer station capacity (63/50/25) MVA ( 132 / 33 / 11 ) k.v in Almagdia site sharing with Dow Al jameh Contracting Co )

– Project Cost : (47,890,000,000)

– Year : (2012 – 2013)

End User: (Basra governorate / General Directorate for electrical energy transmission / South )

( 78/Diwan )

– Tender No : ( 78/Diwan )

– Project Name : ( Supplying Mobil substation capacity (45) MVA. (132 / 33) kv NO (10) (Basra governorate / General Directorate for electrical energy transmission / South ) sharing with the British Company, Archs )

– Project Cost : (26,800,000,000)

– Year : (2014 -2015)

End User: (Basra governorate / General Directorate for electrical energy transmission / South )

1-9